Sunday, March 14, 2010

Camp Hearne Diary - March 6, 2010

We are ready for the plumber to vent the drains through the roof so the roofer can get started on the 15th. Since the building is built on blocks, the joist and beams are the base for the exterior walls. This leaves no room for the drains and water lines to come up throught the floor. The crew double walled the bathroom and "kitchen" area to allow access through the floor behind a "faux wall" finish.

0 COMMENTS: